有關大倫館無障礙電梯鋼構焊接施工說明

大倫館無障礙電梯鋼構焊接施工說明

施工日期:2026/9/1 - 2026/9/2
  1. 焊接期間廠商在室外架設發電機,室外局部區域會有柴油氣味。
  2. 焊接區域會配置滅火器、防火毯、抽風機及安全人員。
  3. 為避免消防誤警報,該區域會進行消防系統隔離,當日施工結束即恢復系統正常運作。
  4. 室內會有些許焊接時產生的異味,請勿驚慌。

Structural Steel Welding Work for Barrier-Free Elevator in Dàlún Hall

Work Dates: Sep 1, 2026 – Sep 2, 2026
  1. A generator will be set up outdoors during the welding period, which may cause partial diesel odor in certain outdoor areas.
  2. The welding area will be equipped with fire extinguishers, fire blankets, exhaust fans, and safety personnel.
  3. To avoid false fire alarms, the fire protection system in the area will be temporarily isolated and restored immediately after the work is completed each day.
  4. Slight odors from welding may be present indoors; please do not be alarmed.

Thông Báo Công Tác Hàn Cấu Kiện Thép Thang Máy Không Rào Cản tại Hội Trường Dàlún

Thời gian thi công: 01/09/2026 – 02/09/2026
  1. Trong thời gian hàn, nhà thầu sẽ lắp đặt máy phát điện ngoài trời, có thể xuất hiện mùi dầu diesel ở một số khu vực ngoài trời.
  2. Khu vực hàn sẽ được trang bị bình chữa cháy, chăn chống cháy, quạt hút và nhân viên an toàn.
  3. Để tránh báo cháy giả, hệ thống phòng cháy của khu vực sẽ được cách ly tạm thời và khôi phục ngay sau khi hoàn thành mỗi ngày.
  4. Có thể xuất hiện một số mùi từ quá trình hàn bên trong nhà; xin đừng hoảng sợ.

公告資訊
公告時間 2026/08/28~2026/09/02
公告分類 其他
公告單位 總務處-營繕組  陳柏年
點閱次數 24
附 件
下載說明:要重複下載檔案,須重新取得下載權。 重新下載
活動資訊
本校配合政府推動ODF文件標準政策,附件檔案目前僅提供ODF (ODT,ODS,ODP,ODG) 與PDF格式,請選擇對應的Microsoft Office程式打開 參考說明